• Home
  • About Us
  • Services
    • Sugar
    • Sugar + Ethanol
    • CBG
    • Solar Power Park
    • Smart Factory Setup
    • Industrial Automation
    • MIDC Land Allotment
  • Clientele
  • Why Us
  • Schedule Appointment
  • Contact Us
  • More
    • Home
    • About Us
    • Services
      • Sugar
      • Sugar + Ethanol
      • CBG
      • Solar Power Park
      • Smart Factory Setup
      • Industrial Automation
      • MIDC Land Allotment
    • Clientele
    • Why Us
    • Schedule Appointment
    • Contact Us
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
  • Services
    • Sugar
    • Sugar + Ethanol
    • CBG
    • Solar Power Park
    • Smart Factory Setup
    • Industrial Automation
    • MIDC Land Allotment
  • Clientele
  • Why Us
  • Schedule Appointment
  • Contact Us

Account

  • Bookings
  • My Account
  • Sign out

  • Sign In
  • Bookings
  • My Account

Sugar + Ethanol

PMC Scope for Sugar+Ethanol Plant Setup


Feasibility & Planning

  • Techno-economic feasibility
  • Cane catchment & feedstock study 
  • CAPEX/OPEX estimation 
  • Financial modelling & project viability
     

Detailed Project Report (DPR)

  • Process design & engineering 
  • Mass & energy balance 
  • PFDs, P&IDs, equipment sizing
  • Utility & integration planning
     

Engineering & Plant Layout

  • Sugar mill layout (mill house, boiling house, evaporators)
  • Distillery layout (fermentation/distillation/dehydration)
  • Boiler, turbine & power house engineering
  • Civil, structural, electrical & automation planning
     

Procurement & Vendor Management

  • RFQ creation, tendering & negotiation
  • Vendor technical evaluation
  • Inspection & quality checks
  • Procurement monitoring
     

Project Execution & Monitoring

  • Master schedule preparation
  • Site coordination with contractors
  • Daily/weekly progress tracking
  • Material delivery & inventory control
     

Construction & Erection Supervision

  • Civil & structural supervision
  • Mechanical & piping erection
  • Electrical installation
  • Safety & quality assurance
     

Commissioning & Handover

  • Pre-commissioning checks
  • Boiler light-up & turbine rolling
  • Distillery start-up & stabilization
  • Sugar mill commissioning
  • Performance Guarantee Test
  • As-built drawings & handover
     

2. LIAISONING & STATUTORY APPROVALS

Land & Local Approvals

  • Land conversion (NA)
  • Local authority permissions
  • Factory license
     

Environmental Clearances

  • CTE & CTO from Pollution Control Board
  • EIA support (if applicable)
  • Hazardous waste authorization
     

Utilities & Infrastructure

  • Power load sanction
  • Substation approval
  • Water extraction permissions
  • Boiler & pressure vessel approvals
     

Sugar Industry Approvals

  • Cane area reservation
  • Sugar factory registration
  • Molasses storage & handling permissions
     

Ethanol Distillery Approvals

  • Distillery & ethanol production licenses 
  • Excise department permissions
  • Ethanol blending program documentation
  • PESO approvals (if required)
     

Labour & Safety

  • ESIC, PF, labour license
  • Fire NOC & safety system approvals
     

Subsidy & Incentive Support

  • State sugar policy incentives
  • Ethanol interest subvention schemes
  • Capital subsidy documentation & follow-up
     

Copyright © 2026 Prakriyaa Consultancy LLP - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept